Bedford | Doors and Tabletops
The crew restores the panel front door with flexible epoxy and new paint. The new marble island top hides a secret feature, a hole in the top concealing a compost bin. Rich works on the upgrades to the ducted HVAC system. Norm uses two old doors to make sliding barn entry doors.
More from Season 33
Episode 1
Bedford | Welcome to the Bedford Project
Work begins on a 300-year-old farmstead.
Episode 2
Bedford | And the Work Begins
The crew transplantis shrubs and plants to a safe place until the job is complete. They also clear small trees and overgrowth that are in the way of the new family room addition.
Episode 3
Bedford | Work on the Addition Begins
The crew removes old clapboards and opens up a hole in the old fieldstone foundation that will connect the old basement space to the new. They also patch a rotted sill.
Episode 4
Bedford | New Entrance, Old Bricks
Framing up the new roof that will overlay the existing roof; repairing the exterior chimney; weaving in bricks.
Episode 5
Bedford | Yard and New Gable Wall
Work begins on clearing the backyard. The crew assembles and raises the gable wall for the family room addition and repairs a historic windowsill.
Episode 6
Bedford | New Space Revealed
The family room addition is framed up and sheathed. The crew installs new post supports in the kitchen accommodate a new stove vent hood and repairs the window sash.